Options choisies: Auteur: Adnène Hajji Type de publications: Articles publiés (RAC) Année de début: 2018 Année de fin: Mot clé dans le titre: Nom de famille d'un co-auteur: Tri à l'intérieur de chaque année: Ordre alphabétique
Articles publiés (RAC)
Assid M., Gharbi Ali, Hajji Adnène, Production planning and control of unreliable hybrid manufacturing-remanufacturing systems with quality-based categorization of returns, Journal of Cleaner Production, vol. 312, #127800, 2021
Assid M., Gharbi Ali, Hajji Adnène, Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities, International Journal of Production Economics, vol. 224, #107549, 2020
Assid M., Gharbi Ali, Hajji Adnène, Production and subcontracting control for an unreliable manufacturing system with setups, International Journal of Production Research, vol. 58(12), pp. 3570-3588, 2020
Ndhaief N., Rezg N., Hajji Adnène, Bistorin O., Environmental issue in an integrated production and maintenance control of unreliable manufacturing / remanufacturing systems, International Journal of Production Research, 58(14): 4182-4200, 2020
Assid M., Gharbi Ali, Hajji Adnène, Production planning of an unreliable hybrid manufacturing-remanufacturing system under uncertainties and supply constraints, Computers & Industrial Engineering, vol. 136, pp. 31-45, 2019
Assid M., Gharbi Ali, Hajji Adnène, Production and setup control policy for unreliable hybrid manufacturing-remanufacturing systems, Journal of Manufacturing Systems, vol. 50, pp. 103-118, 2019
Berthaut F., Pellerin Robert, Hajji Adnène, Perrier N., The impact of project characteristics on the efficiency of activity overlapping in project scheduling, Journal of Modern Project Management, vol. 7(1), 2019
Berthaut F., Pellerin Robert, Hajji Adnène, Perrier Nathalie, The impact of project characteristics on the efficiency of activity overlapping in project scheduling, The Journal of Modern Project Management, vol. 7(1), 2019
Berthaut F., Pellerin Robert, Hajji Adnène, Perrier N., A path relinking-based scatter search for the resource-constrained project scheduling problem, International Journal of Project Organisation and Management, vol. 10(1), 2018
|